1. The Core Concrete Slab Formula

Because 1 cubic yard is a cube measuring 3 ft × 3 ft × 3 ft (27 cubic feet), start by converting your slab thickness from inches into feet (Thickness in Inches ÷ 12), multiply by length and width to get cubic feet, and divide by 27:

  • Volume in Cubic Feet: Length (ft) × Width (ft) × (Thickness in Inches ÷ 12)
  • Volume in Cubic Yards: Volume in Cubic Feet ÷ 27

For example, a 10 ft × 10 ft patio slab poured 4 inches thick has an area of 100 sq ft and a depth of 4 ÷ 12 = 0.3333 ft. Multiplying 100 × 0.3333 gives 33.33 cubic feet, and dividing 33.33 ÷ 27 gives 1.23 cubic yards (before adding a 5% to 10% allowance for subgrade variation and spillage).

2. How Many 80 lb or 60 lb Bags Equal 1 Cubic Yard?

If you are mixing bagged concrete in a wheelbarrow or portable drum mixer, check the cubic-foot yield printed on the side of the bag:

  • 80 lb Bag (0.60 cu ft yield): Divide total cubic feet by 0.60. One cubic yard (27 cu ft) requires 45 bags (27 ÷ 0.60 = 45). A 10×10 slab at 4 inches thick (33.3 cu ft) requires 56 bags before waste.
  • 60 lb Bag (0.45 cu ft yield): Divide total cubic feet by 0.45. One cubic yard requires 60 bags (27 ÷ 0.45 = 60). A 10×10 slab at 4 inches thick requires 74 bags before waste.
  • 50 lb Bag (0.375 cu ft yield): Divide total cubic feet by 0.375. One cubic yard requires 72 bags.

3. Ready-Mix Delivery Truck vs. Mixing Bags by Hand

A single cubic yard of mixed concrete weighs roughly 4,000 pounds (2 US tons). Once a slab exceeds 1.5 to 2.0 cubic yards (68 to 90 bags of 80 lb mix), ordering a ready-mix concrete truck is usually both cheaper—even with a short-load delivery fee—and produces a far stronger, monolithic slab without cold joints between batches.